Welcome to RF Web Server

 

 

 

 

 

Technical Notes

 

 

 

This page lists the RF's technical notes. Other documents: Publication preprints Instrumentation Systems, and LLRF

To submit a paper, email the document, pdf or word, to llopez@fnal.gov. Keep the document to a reasonable size, doublecheck if all figures are properly aligned,and don't add a technote number to it, that will be done by the technote administrator.

 

 

 


 

 

 

 

Tech note

Title

Author

Date Added

Doc

001

Fiber Optic Delay Tracking Experiment

R. Pasquinelli D. McDowell

12/1/00

pdf

002

Design of the Core 2-4 GHz Betatron Equalizer

C. Deibele

2/26/01

pdf

003

Design of an 805 Mhz BPF Filter for the High Energy Section of the Linac at Fermilab

C. Deibele

2/26/01

pdf

004

Design of Microwave Band Pass Filters for the Debuncher Stochastic Cooling System

C. Deibele

2/26/01

pdf

005

Simulation and Measurement Considerations for Resonant Cavity Couplers and Extrapolating Results to Multiple Cells and Varying Conductivities

T. Berenc, C. Deibele

2/26/01

pdf

006

4-8 GHz Petter 180 Hybrid for the Pbar Debuncher Pickup

Ed Cullerton

2/28/01

pdf

007

Design and Implementation of the Debuncher Bands 3 and 4 System Filters

C. Deibele

2/28/01

pdf

008

PBAR BPM VXI Down Converter Checks

Dan Klepec

2/28/01

pdf

009

Embedded Systems Group LLRF Documentation, Linkport.doc

LLRF Group

2/28/01

pdf

010

Noise Performance of the Debuncher Stochastic Cooling Systems

R. Pasquinelli

3/27/01

pdf

011

Simulation of Two Rival Input Coupler Designs for the Superconducting Kaon Separator Cavity

C. Deibele, T. Berenc, M. Champion, J. Reid

3/27/01

pdf

012

MI-60 Recycler and Lab BPM Measurements

P. Prieto and D. Heikinen

4/06/01

pdf

013

Design, Measurement, and Procedure for Assembling SMA-96 Mil 2.33 Dielectric Constant

C. Deibele

4/11/01

pdf (>2Mb)

014

Measured Longitudinal Beam Impedance of Booster Gradient Magnets

J. L. Crisp and B. J. Fellenz

4/13/01

pdf

015

ARF1 and DRF1 Curve Calibrations

R. Pasquinelli

5/01/01

pdf

016

Console Library for the Beam Line Tuners

T.S. Meyer

4/20/01

pdf

017

Diplexer for Recycler Medium Level Electronics

E. Cullerton

4/26/01

pdf

018

Debuncher Band 4-Upper Momentum Band Pass Filter Modification

C. Deibele

4/26/01

pdf

019

3.27 GHz IIR Notch Filter for the 2-4 GHz Stacktail Momentum Cooling System

E. Cullerton

5/09/01

pdf

020

Optics for Recycler Stochasic Cooling

R. Pasquinelli

07/24/01

pdf

021

Measured Aperture of the Recycler Stochastic Cooling Light Pipe

R. Pasquinelli

07/25/01

pdf

022

Microwave Equalizer for the Antiproton Source 4-8 GHz Accumulator System

E. Cullerton

09/01

pdf (>1Mb)

023

A Solid State Driven Power Amplifier Design for Booster RF Cavities

T. Berenc and J. Reid

08/02/01

pdf

024

Debuncher Momentum Systems

R. Pasquinelli

12/18/01

pdf

025

Kaon Separator Cavity RF Drive Power Requirements

T. Berenc

01/14/2002

pdf

026

FBI Calibration from a Front End

T.S. Meyer

11/27/2001

pdf

027

Drive Power Considerations for Externally Loaded Resonant Cavities

T. Berenc

01/23/2002

pdf

028

Beam Line BLM Log Amplifier Evaluation for Boone

M. Olson

01/25/01

pdf

029

Longitudinal Schottky Pickup for the Recycler

E. Cullerton & M. Hu

01/02

pdf

030

Temperature Control for the Recyler Stocastic Cooling Optical Component

D. Broemmelsiek

02/02

pdf

031

Electronic Systems for Proposed Anti-Proton Source Accumulator Core Betatron Systems

E. Cullerton

03/02

pdf

032

Recycler ICF PS RF

J. Fitzgerald

06/02

pdf

033

Recycler Stoachastic Cooling Tank Motion Control

D. McDowell

09/02

pdf

034

RF Diode Peak Detector Calibration

T. Berenc

09/02

pdf

035

Recycler Stochastic Cooling System Pico-motor Mirrors

D. McDowell

09/02

pdf

036

Precision Band Pass Filters for the Debuncher Stochastic Cooling

D. Sun

07/02

pdf

037

Dimensions and Measurements of Waveguide-Coax Launchers for Pbar Accumulator core cooling upgrade

D. Sun

07/02

pdf

038

Microwave Absorber Design in Pbar Accumulator Core Cooling Upgrade

D. Sun

07/02

pdf

039

FNAL Instrumentation Lessons Learned

J. Crisp

5/02

pdf

040

Debuncher Cooling Cryo Interlock Box

D. McDowell

07/02

pdf

041

Investigation of Logarithmic Amplifier Output Response

A. Yousif

08/02

pdf

042

Performance of the Debuncher Momentum Cooling Notch Filters

R. Pasquinelli

04/03

PDF

043

ARF1 Power Amplifier Repair

R. Vargo

12/02

PDF

044

PI Peak Detector Cal

T. Berenc

08/27/02

PDF

045

Reflective Interface Effects

T. Berenc

09/28/02

PDF

046

Beam Loading Compensation

J. Dey

02/03/03

PDF

047

Bandpass Filter for Recycler Momentum System

Ding Sun

01/2003

PDF

048

Equalizer for Accumulator Core Cooling Uprgade

Ding Sun

01/2003

PDF

049

Design and RF Measurement Results of Schottky Pickup for Recycler and Tevatron

Ding Sun

01/2003

PDF

050

Design and Measurement Results of Microwave Absorbers in Schottky Pickup for Recycler and Tevatron

Ding Sun

01/2003

PDF

051

Dimensions and Measurements of Waveguide-Coax Launchers in Schottky Pickup for Recycler and Tevatron

Ding Sun

01/2003

PDF

052

Recycler Beam Scraper Motion Control

D. McDowell

03/2003

PDF

053

The Design of a Physically Symmetric 2-Port RF Junction Applied to the CKM Input Coupler RF Feedthrough

T. Berenc

04/2003

PDF

054

CKM Horizontal Input Coupler External Quality Factor Simulations

T. Berenc

04/2003

PDF

055

YK1240 Klystron Performance Measurements for the Photo-Injector Laboratory Capture Cavity System

T. Berenc John Reid Rick Zifko

07/2003

PDF

056

Installation of the New Trig 1 and Trig 2 PULSE DISTRIBUTION SYSTEM for the MI-60 Gallery.

T. Kubicki

06/2003

PDF

057

53 MHZ FeedForward Beam Loading Compensation in the FERMILAB Main Injector

J. Dey

09/2003

PDF

058

2.5 MHZ FeedForward Beam Loading Compensation in the FERMILAB Main Injector

J. Dey

09/2003

PDF

059

Linearization of the FERMILAB Recycler High Level RF

J. Dey

09/2003

PDF

060

1.7 GHz Schottky Monitor System

R. Pasquinelli

10/2003

PDF

061

Dynamic Emittance Monitor for the Recycler

Ed Cullerton, R. Pasquinelli

12/2003

PDF

062

Gating System for Recycler 1.75 GHz Schottky Detector

Ed Cullerton, R. Pasquinelli

12/2003

PDF

063

A 1.75 GHz Schottky Detector for the Recycler

Ed Cullerton, R. Pasquinelli

12/2003

PDF

064

Optical Notch Filters for Recycler Stochastic Coolong

Ed Cullerton, R. Pasquinelli

12/2003

PDF

065

Installation of the New WatchDog Modules at MI-60

Tom Kubicki

12/2003

PDF

066

ARF1 performance

R. Pasquinelli

03/2004

PDF

067

Pbar Debuncher Driver

R. Vargo

06/2004

PDF

068

3.9 GHz SCRF Deflecting Cavity Input Coaxial Cable

T. Berenc.
R. Rabehl,
A. Rowe

06/2005

PDF

069

Status of the Main Injector Mid-Level Radio Frequency (MRF) Project

T. Berenc,
B. Chase

06/2005

PDF

070

Main Injector HLRF Station Gain Measurements

T. Berenc

06/2005

PDF

071

A0 North Cave-SCRF Test Stand

T. Berenc

08/2004

PDF

072

Main Injector HLRF ON/OFF and Track/Hold Gates Timing

T. Berenc,
B. Chase, et al

08/2005

PDF

073

A Brief History of the MI 53MHz RF System Run II Upgrades

T. Berenc,
B. Chase, et al

09/2005

PDF

074

DRF1 Cavity Power Amplifier Repair

R. Vargo

09/2005

PDF

075

DRF1 Anode Supply Replacement

R. Vargo

09/2005

PDF

076

The Mid-Level RF (MRF) Handbook

T.Berenc,
P.Varghese,
P.Joireman,
B.Barnes,
B.Chase,
J.Dey,
J.Reid

12/2005

PDF

 

077

MI-11 Stochastic Cooling Lightpipe Vacuum Upgrade

D. McDowell

01/2006

PDF

 

 

078

Proposed Booster High Level RF
Upgrade

J.Reid

03/31/2006

PDF

079

IQ Modulation Transfer Functions for a Resonant Cavity

T. Berenc

05/2006

PDF

080

Design of LHC Schottky Pickup

D. Sun

04/2006

PDF

081

A Review of System Delay Compensation Schemes for use in the MI RF System.

 

T. Berenc, B.Chase,

S. Kotz

11/2006

PDF

082